Facts At A Glance Pre K-12 Priorities Vision, Mission, Belief Harbor Council Parent Teacher Association Contact Us
District Departments
Board of Education Trustee Area Boundary Adjustment Current Board Meeting Agenda Upcoming Board Meetings - 2017 Agendas, Minutes, DVD, and Video Policies and Administrative Regulations Karen Yelsey, President Vicki Snell, Vice President Charlene Metoyer, Clerk Dana Black, Member Walt Davenport, Member Martha Fluor, Member Judy Franco, Member
School Calendars and Student Holidays
Educational Program Resources and Information Athletics Visual and Performing Arts
Bienvenidos
Employment Opportunities With N-MUSD Administration Open Positions Certificated Open Positions
Resource Page for Employees Student and Community Services

Current Projects

Corona del Mar - Field Renovations

CdM Sports Field Plan
 

 

Project Overview:
Newport-Mesa Unified School District (NMUSD) is working to construct various upgrades to the sports field at Corona Del Mar High School (CdMHS). The project would facilitate various functions, some of which currently occur off site.

 

The project is currently in the environmental phase, which includes the development of an Environmental Impact Report (EIR) as part of the California Environmental Quality Act (CEQA). The EIR will analyze potential environmental impacts that may result from this project, as well as mitigation measures. 

 

Current Project Documents:

Project Fact Sheet (Revised 09/13/17)

Notice of Availability of the Recirculated Draft Environmental Impact Report*

Recirculated Draft Environmental Impact Report (August 2017)

Notice of Improvement (September 13, 2017 - Information Meeting) 

 

* Please note:  Hard copies of the RDEIR will not be provided. You may download a copy from the link above, or come in to the District Office or the CdMHS Administration Office to view a copy.

 

Archived Project Documents:

Initial Study (February 2016)

Recirculated Initial Study (March 2016)

Notice of Availability of the Draft Environmental Impact Report*

Draft Environmental Impact Report (February 2017)

* Please note:  Hard copies of the DEIR will not be provided. You may download a copy from the link above, or come in to the District Office or CdMHS Administration Office to view a copy.

 

 

Corona del Mar - Learning Resource Center

CdM LRC under construction
CdM LRC Construciton
CdM Library Interior Rendering

Project Description:

Project includes alterations to existing CdM library to modernize the space into the new Learning Resource Center. The CdM LRC will include a more open floor plan with collaborate and computer spaces. It is also include (3) study rooms and (1) small conference room. The design intent is to provide a more collegiate feel to the space. This project is funded by the CdM Foundation.  Project has started construction with occupancy anticipated for the second semester of the 17-18 school year.

 

Notice of Improvement (April 17, 2017 - Information Meeting)

 

Corona del Mar - Locker Restoration

CdM Lockers
 

Project Description:

PTA funded project included maintenance and restoration of existing lockers around the CdM quad.

Corona del Mar - Reclaimed Water

CdM Reclaimed Water Plan
 

Project Description:

Project scope is to convert the CdM athletic fields to reclaimed water.  Project currently in Design Development.

Corona del Mar - Varsity Baseball Field Backstop Replacement Project

CdM Baseball Backstop Rendering
 

Project Overview:

Anticipated Start: Summer 2017

Construction consists of replacement and relocation of existing baseball backstop to prevent stray foul balls from leaving the playing field.

 

Project Documents:

Notice Of Improvement (March 6, 2017 - Information Meeting)

Costa Mesa High School - Project Lead The Way

CMHS Project Lead the Way
 

Project Description:

To accommodate the PLTW curriculum alternations are required for the existing building W.  These upgrades include an opening the floor plate with enhanced power and data for curriculum requirements.  Project anticipated to start Summer 2017.

Costa Mesa High School - State of the Schools

CMHS Gym Floor
CMHS Mustangs Logo
 

Project Description:

In anticipation of the 2017 State of the Schools, CMHS is receiving a refresh of its existing gym.  Upgrades include flooring finish, new AV, and a divider curtain.  Construction is underway and will be complete for the State of the Schools.

Estancia High School - Aquatic Facilities

EHS Pool Plan
Project Description:

Project includes removal of the existing EHS 25 meter pool and installation of a new 50 meter pool and support structures.  The project is DSA approved and expected to begin in Fall 2017 and completed Summer 2018.

Estancia High School - Classroom Storefront

EHS Classroom Enclosure

Project Description:

Project includes replacement of existing classroom entry gates with storefront glass system.  Construction has started and will be completed prior to the 17-18 school year.

Newport Harbor High School - Softball Scoreboard

Project Description:

Replacement of existing Varsity softball scoreboard at Newport Harbor High School.  The project is in the design phase.

2018 HVAC Upgrades

Project Description:

Heating, Ventilation and Air Conditioning (HVAC) projects include the complete replacement of systems at various schools.  This is the third phase of a District wide HVAC upgrade.  Anticipated start in Summer 2018.

Davis Magnet School - DROPS

Davis DROPS

Project Description:

Project includes upgrades to the landscaping on campus to go to a S.T.E.A.M. program from a S.T.E.M. program.  Anticipated start is Summer 2018.

Contact Us

Ara Zareczny
Director, Facilities Development, Planning and Design
azareczny@nmusd.us
714-424-7522

 

Flavia Mendez
Administrative Assistant
fmendez@nmusd.us
714-424-8934

 

Steve Morris
Facilities Planning Coordinator
smorris@nmusd.us
714-679-9891

 

Mark Manstof
Facilities Analyst
mmanstof@nmusd.us
714-424-7567