Facts At A Glance Pre K-12 Priorities Vision, Mission, Belief Harbor Council Parent Teacher Association Contact Us
District Departments
Board of Education Trustee Area Boundary Adjustment Current Board Meeting Agenda 2018 Upcoming Board Meetings Agendas, Minutes, DVD, and Video Policies and Administrative Regulations Vicki Snell, President Charlene Metoyer, Vice President Martha Fluor, Clerk Dana Black, Member Walt Davenport, Member Judy Franco, Member Karen Yelsey, Member
School Calendars and Student Holidays
Educational Program Resources and Information Athletics Visual and Performing Arts
Bienvenidos
Employment Opportunities With N-MUSD Administration Open Positions Certificated Open Positions
Resource Page for Employees Student and Community Services

Current Projects

Corona del Mar - Learning Resource Center

CdM LRC under construction
CdM LRC Construciton
CdM Library Interior Rendering

Project Description:

Project includes alterations to the existing Corona del Mar Library to modernize the space into the new Learning Resource Center. The CdM LRC will include a more open floor plan with collaborative and tech spaces. It also includes (3) small study rooms and (1) large study room. The design intent is to provide a more collegiate feel to the space. This project is jointly funded by the CdM Foundation and District funds.  Project has started construction with occupancy anticipated for the second semester of the 17-18 school year.

 

Notice of Improvement (April 17, 2017 - Information Meeting)

 

Corona del Mar - Sports Fields

Two Field Option
 

 

Project Overview:
Newport-Mesa Unified School District (NMUSD) is working to construct various upgrades to the sports field at Corona Del Mar High School (CdMHS). The project would facilitate various functions, some of which currently occur off site.

 

On October 24, 2017, the Board of Education approved the Final Environmental Impact Report.  The Board has authorized Staff to begin the design process for Option B, depicted above.  Option B includes two synthetic turf fields, one rubber track, sports lighting and spectator seating. 

 

Current Project Documents:

 

Corona del Mar Sports Field Project Fact Sheet (revised 10/17/2017)

Final Environmental Impact Report (October 2017)

Recirculated Draft Environmental Impact Report (August 2017)

* Please note:  Hard copies of the RDEIR will not be provided. You may download a copy from the link above, or come in to the District Office or the CdMHS Administration Office to view a copy.

 

Archived Project Documents:

Initial Study (February 2016)

Recirculated Initial Study (March 2016)

Notice of Availability of the Draft Environmental Impact Report*

Draft Environmental Impact Report (February 2017)

Notice of Improvement (September 13, 2017 - Information Meeting) 

 

* Please note:  Hard copies of the DEIR will not be provided. You may download a copy from the link above, or come in to the District Office or CdMHS Administration Office to view a copy.

 

 

Corona del Mar - Varsity Baseball Field Backstop Replacement Project

CdM Baseball Backstop Rendering
 

Project Overview:

Anticipated Start: Summer 2017

Construction consists of replacement and relocation of existing baseball backstop to prevent stray foul balls from leaving the playing field.

 

Project Documents:

Notice Of Improvement (March 6, 2017 - Information Meeting)

Costa Mesa High School - Softball Batting Cage

Planning and design is underway on a new two lane softball batting cage for Costa Mesa High School.

 

Anticipated Construction: Summer 2018

Estancia High School - 50 Meter Pool

Project Description:

Project includes removal of the existing Estancia High School pool and installation of a new 50 meter pool and support facilities.  The District is currently working with the school site to finalize the scope for design and construction.

Estancia High School - Theater

Planning has begun on a new theater for Estancia High School.  The district has published an RFQ for architectural design firms to respond.

Newport Harbor High School - Softball Scoreboard

Project Description:

Replacement of existing Varsity softball scoreboard at Newport Harbor High School.  The project is in the design phase.

2018 HVAC Upgrades

Project Description:

Heating, Ventilation and Air Conditioning (HVAC) projects include the complete replacement of systems at various schools.  This is the third phase of a District wide HVAC upgrade.  Anticipated start in Summer 2018.

 

Anticipated Heating, Ventilation and Air Conditioning (HVAC) Installation Plan

Below is the Newport-Mesa Unified School District's anticipated phased-in plan for installing Heating, Ventilation and Air Conditioning (HVAC) in all schools and district facilities.  Please note that the following schedule is tentative and subject to change due to varying unforeseen factors.

 

SCHOOL HVAC NOTES
California Yes Completed Summer 2015
TeWinkle Yes Completed Summer 2015
Killybrooke Yes Completed Summer 2015
Early College HS Yes Completed as part of modernization in 2016
Paularino Yes Completed Summer 2016
Sonora Yes Completed Summer 2016
Adams Yes Completed Summer 2016
Victoria Yes Had HVAC prior to projects
Rea Yes Had HVAC prior to projects
Eastbluff Yes Had HVAC prior to projects
Andersen Yes Had HVAC prior to projects
Lincoln Yes Had HVAC prior to projects
Newport Coast Yes Had HVAC prior to projects
Estancia HS Yes Had HVAC prior to projects
Corona del Mar MS/HS Yes Had HVAC prior to projects
Davis Magnet Anticipated Completion 2018 In design
College Park Anticipated Completion 2018 In design
Wilson Anticipated Completion 2018 In design
Pomona Anticipated Completion 2018 In design
Kaiser Anticipated Completion 2018 In design
Woodland Anticipated Completion 2018 In design
Whittier Anticipated Completion 2019  
Mariners Anticipated Completion 2019  
Newport Heights Anticipated Completion 2019  
Ensign Anticipated Completion 2019  
Newport El Anticipated Completion 2019  
Harbor View Anticipated Completion 2019  
Back Bay HS Anticipated Completion 2019  
Costa Mesa MS/HS Anticipated Completion 2020 Partial HVAC; full HVAC anticipated 2020
Newport Harbor HS Anticipated Completion 2021 Partial HVAC; full HVAC anticipated 2021

 

Mariners Elementary School - Admin and Fence

Planning has begun to reconfigure the admin area and site fencing for Mariners Elementary School.

Newport Heights Elementary School - Admin and Fence

Planning has begun to reconfigure the admin area and site fencing for Newport Heights Elementary School.

Wilson Elementary School - Admin and Fence

Planning has begun to reconfigure the admin area and site fencing for Wilson Elementary School.

Contact Us

Ara Zareczny
Director, Facilities Development, Planning and Design
azareczny@nmusd.us
714-424-7522

 

Flavia Mendez
Administrative Assistant
fmendez@nmusd.us
714-424-8934

 

Steve Morris
Facilities Planning Coordinator
smorris@nmusd.us
714-679-9891

 

Mark Manstof
Facilities Analyst
mmanstof@nmusd.us
714-424-7567