Facts At A Glance Pre K-12 Priorities Vision, Mission, Belief Harbor Council Parent Teacher Association Contact Us
District Departments
Board of Education Trustee Area Boundary Adjustment Current Board Meeting Agenda Upcoming Board Meetings - 2017 Agendas, Minutes, DVD, and Video Policies and Administrative Regulations Karen Yelsey, President Vicki Snell, Vice President Charlene Metoyer, Clerk Dana Black, Member Walt Davenport, Member Martha Fluor, Member Judy Franco, Member
School Calendars and Student Holidays
Educational Program Resources and Information Athletics Visual and Performing Arts
Bienvenidos
Employment Opportunities With N-MUSD Administration Open Positions Certificated Open Positions
Resource Page for Employees

Current Projects

Corona del Mar - Field Renovations

Project Overview:
Newport-Mesa Unified School District (NMUSD) is working to construct various upgrades to the sports field at Corona Del Mar High School (CdMHS). The project would facilitate various functions, some of which currently occur off site.

 

The project is currently in the environmental phase, which includes the development of an Environmental Impact Report (EIR) as part of the California Environmental Quality Act (CEQA). The EIR will analyze potential environmental impacts that may result from this project, as well as mitigation measures. 

 

Project Documents:

Click here to view the project fact sheet (revised 5/8/17)

Click here for the Initial Study (February 2016)

Click here for the Recirculated Initial Stud (March 2016)

Click here for the Notice of Availability of the Draft Environmental Impact report for the Corona del Mar Middle and High School Sports Field Project*

Click for the Draft Environmental Impact Report (February 2017)

* Please note:  hard copies of the Draft Environmental Impact Report will not be provided.  You may download a copy from the link above, or come in to the District Office or Corona del Mar High School Administration Office to view a copy.

 

Additional Resources:

Click here to view the NMUSD Rules and Regulations for the Use of School Facilities Under the Civic Center Act 

 

 

 

Corona del Mar - Learning Resource Center

CdM Library Interior Rendering
 

Project Description:

Project includes alterations to existing CdM library to modernize the space into the new Learning Resource Center.  This project is funded by the CdM Foundation.  Project anticipated to start Summer 2017.

 

Click here for the Notice of Improvement (April 17, 2017 - Information Meeting)

Corona del Mar - Reclaimed Water

Project Description:

Project scope is to convert the CdM athletic fields to reclaimed water.  Project currently in Design Development.

Corona del Mar - Varsity Baseball Field Backstop Replacement Project

CdM Baseball Backstop Rendering
 

Project Overview:

Anticipated Start: Summer 2017

Construction consists of replacement and relocation of existing baseball backstop to prevent stray foul balls from leaving the playing field.

 

Project Documents:

Click here for the Notice Of Improvement (March 6, 2017 - Information Meeting)

Costa Mesa High School - Project Lead The Way

Project Description:

To accommodate the PLTW curriculum alternations are required for the existing building W.  These upgrades include an opening the floor plate with enhanced power and data for curriculum requirements.  Project anticipated to start Summer 2017.

Costa Mesa High School - State of the Schools

Project Description:

In anticipation of the 2017 State of the Schools, CMHS is receiving a refresh of its existing gym.  Upgrades include flooring finish, new AV, and a divider curtain.  Project anticipated to start Summer 2017.

Estancia High School - Aquatic Facilities

Project Description:

Project includes removal of the existing EHS 25 meter pool and installation of a new 50 meter pool and support structures.  Anticipated start in late 2017.

 

Click here for Notice of Improvement (June 5, 2017 - Information Meeting)

Estancia High School - Classroom Storefront

Project Description:

Project includes replacement of existing classroom entry gates with storefront glass system.  Anticipated project start is Summer 2017.

Estancia High School - Tree Row

Newport Harbor High School - Davidson Field

Project Description:

Construction continues on the structural rehabilitation and refresh of Davidson field.  Davidson will be receiving a new artificial field, track, and concessions building, as well as upgrades to the existing bleachers and press box.  Estimated completion is April 2017.

Newport Harbor High School - Baseball Scoreboard

Project Description:

The NHHS baseball boosters are funding a new scoreboard for the NHHS Varsity Baseball field to replace the existing scoreboard.  Anticipated start is Spring 2017.

2017 HVAC Upgrades - College Park, Davis, Pomona, Wilson

Project Description:

Heating, Ventilation and Air Conditioning (HVAC) projects include the complete replacement of systems at College Park, Davis, Pomona, and Wilson schools.  This is the third phase of a District wide HVAC upgrade.  Anticipated start in Summer 2017.

Davis Magnet School - DROPS

Project Description:

Project includes upgrades to the landscaping on campus to go to a S.T.E.A.M. program from a S.T.E.M. program.  Anticipated start is Summer 2017.

Contact Us

Ara Zareczny
Director, Facilities Development, Planning and Design
azareczny@nmusd.us
714-424-7522

 

Flavia Mendez
Administrative Assistant
fmendez@nmusd.us
714-424-8934

 

Steve Morris
Facilities Planning Coordinator
smorris@nmusd.us
714-679-9891

 

Mark Manstof
Facilities Analyst
mmanstof@nmusd.us
714-424-7567